A follow up to the mission conducted in August 2016. The team had meetings with the Dam managers and engineering representatives to ascertain the current risk perception of a dam breach and receive an update on the progress of repairs by Trevi Geo Engineering.

Principales constatations: 

The findings from the mission were then used to feed the Mosul Dam Preparedness Concept of Operations and the Emergency Preparedness Plan.

Rapport d'évaluation: 
Publicly Available
Questionnaire d'évaluation: 
Not Available
Données d'évaluation: 
Not Available
Contact(s): 
Georgia Farley
georgia.farley@wfp.org
+393472692863 (Mobile)
Espace(s): 
Date(s) de l'évaluation: 
30 mar 2017
État de l'évaluation: 
Report completed
Type de population: 
Autres
Cluster / Secteurs: 
Agence(s) chef de file: 
Programme Alimentaire Mondial
Lieux: 
Al Mosul
Autres lieux: 
Mosul Dam
Thèmes: 
Réduction des Risques de Catastrophe