Gaza CWG work-plan 2020

The workplan has been produced through a participatory process which included three steps:

- a full-day workshop with all partners of the Gaza CWG on 04/03/2020 where activities, priorities and load-distribution were discussed and debated;

- the revision by all CWG members of a first draft of the work-plan developed by the CWG Coordinator;

- the revision by all Inter-Cluster Coordination Group (ICCG) members of the second draft of the work-plan.

The final product is the present work-plan that will inform the activities of the CWG throughtout 2020.

Operation(s)/ Webspace(s): 
Organization(s): 
Gaza Cash Programming Working Group (State of Palestine)
Cluster(s)/Sector(s): 
Original Publication Date: 
25 Mar 2020
Document type: 
Work Plan